[stack_hero layout=”fullscreen” image=”147″ opacity=”6″ height=”40″]

Studies

[/stack_hero]

STUDIES FOR SURFACE AND UNDERGROUND WATER MANAGEMENT

[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]

Inundability studies

  • Inundability study for the areas of watercross- oil park 395 Cucuieti (Hydrologic study for each section, Topographic study, Hydraulic study for determining the levels for cross sections and longitudinal profiles)
  • Hydrologic and inundability study for “”MM-CL_13- Object 5: New water treatment plant in Săbisa (Seini), located in Seini city, Maramures county”
[/stack_boxed_content]
[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]

Hydrological studies

  • Plans for prevention, protection and mitigation of flood effects within hydrographical basins Arges- Vedea, Banat, Jiu, Olt si Somes- Tisa
[/stack_boxed_content]
[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]

Water management studies

  • Elaboration of technical documents and obtain the water permit for 25 bridges located in Bucharest
  • Elaboration of technical documents for obtaining the Water management permit for bridges within Galati Railway area
[/stack_boxed_content]

FIELD STUDIES

[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]

Topography

  • Elaboration of cadaster documents necessary for obtaining cadaster numbers and subscription to local Land Register of lands owned by Constanta Railway

Geology

  • Investigation, Geologic report and Risk Assessment Study for Tulcea Oil Deposit
[/stack_boxed_content]

ENVIRONMENTAL PROTECTION

[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]

Environmental impact studies

  • Research for elaborating the environmental impact study regarding the construction of micro-hydropower plants on Romanian water cources

Appropriate assessment studies

  • Appropriate assessment for the project “Hydro-power development on Buzau river, sector Nehoiu – Pârscov, hydropowers of small capacity, Buzau catchment (Nehoiu), Chemp Buzău 1, Chemp Buzău 2, Chemp Buzău 3, Chemp Buzău 4, Chemp Buzău 5, Buzau County”

Environmental balance

Geotechnical studies

  • Investigation, Geologic report and Risk Assessment Study for Tulcea Oil Deposit
[/stack_boxed_content]

STUDIES FOR TRACKING THE CONSTRUCTION BEHAVIOR IN TIME

[stack_boxed_content background=”bg–secondary” shadow=”box-shadow”]
  • Analysis of constructions and equipment behavior at Pecineagu Reservoir
  • Project for special trackof construction behavior at Mihailesti Storage on Arges River
[/stack_boxed_content]
Back